PROPOSED 2008 CONSTRUCTION PROJECTS

08–01 Street Reconstruction

Rule 

City Notifications

2008 Street Map

Download the 08-01 Street Reconstruction Map

November 28

Download the November 28, 2007 notification

January 10

Download the January 10, 2008 notification

January 23 Download the January 23, 2008 meeting outline
January 23 Download the Proposed Assessment Roll
January 24 Download Oak Terrace and Spruce Place Intersection Design Option A (30' Wide)
January 24 Download Oak Terrace and Spruce Place Intersection Design Option B (Roundabout)
January 24 Download Oak Terrace and Spruce Place Intersection Design Option C (Porkchop)
February 26 Download the Feasibility Report presented to the City Council on February 26, 2008
March 14, 2008 Download the March 14, 2008 notification
March 28, 2008 Download the March 28, 2008 notification
April 22, 2008 Download Update No. 1 to ALL 08-01 Residents
April 24, 2008 Download Update No. 2 to Homewood Place Residents

 

08–04 Matoska Park Restroom Reconstruction

Rule 

City Notifications

April 29, 2008

Download the 08-04 Bid Results

   
   
   

 

08–08 / 08-09 Lily Lake and Varney Lake

Rule 

City Notifications

08-08 Aerial Map

Download the 08-08 (Lily Lake) Aerial Map

08-09 Aerial Map Download the 08-09 (Varney Lake) Aerial Map

December 7

Download the December 7, 2007 notification

January 14

Download the January 14, 2008 notification