Right-of-Way Permits

Boring Machine

Right-of-way is the property on which the street is located and that extends behind the curb approximately 10 to 15 feet. Any work performed within the public right-of-way requires a permit.  Please complete and submit the application below for engineering review.

Questions?  Contact the Engineering Department at (651) 429-8531, or email contact@whitebearlake.org

 

Right-of-Way Permit Fees

Excavation or Non-Excavation (Obstruction)

$200 and $3,000 deposit

Small Cell Wireless Facility Permit Fee

(up to 5 individual sites)

$500

Small Cell additional sites (after the first 5)

$100