2024 Sanitary Sewer Lining Project

Project Type:
Sewer
Project Status: 
Approved

Since 1994, the City has been installing liners in sanitary sewer main which are difficult to maintain due to access constraints, root intrusion problems, frequent backup problems and/or pipe failures.  Liners also seal pipe joints, preventing groundwater from entering the sewer main (know as "infiltation").  Installing liners rather than new pipe minimizes the cost because the liners do not require excavation of the roadway or easement area, disturbance of existing water, storm sewer or other private utilities or the disruption of service to customers.  The sanitary sewer lining program is ongoing with project areas determined each year based on system performance.

Status Updates

Advertisement for Bids

An exclusive electronic bidding process is being used for 2024 Sanitary Sewer Lining Project.  Plans, specifications, bid forms and contract documents may be obtained through QUEST CDN at www.questcdn.com.  Bids must be submitted electronically using the QUEST CDN system, no paper bids will be considered.

Bid Results

Bids for the 2024 Sanitary Sewer Lining Project will be opened in 2024.